The project involves an open-cut pit mining thermal coal at up to 8 Mtpa run-of-mine (ROM) coal to produce 5 Mtpa of product coal for export. The project will develop of a rail line to connect the Elimatta project to the Surat Basin Rail, north of Wandoan. The development of the rail line will facilitate the development of coal reserves located to the west of the Elimatta deposit.